Setting Base Anchors !
1. Create concrete anchors.
A. Build three forms. Each form will require (2) 15″ long 2x4s; (2) 18″ long 2x4s; and (1) 18″ x 18″ piece of ½” plywood or OSB board. Nail, screw and/or glue the pieces together as shown in Drawing 1. When finished, the inside of the box should be 15″ x 15″, the same size as your base.
B. Position the anchor on the “X”. Using a chalk line or a pencil and straight edge, draw straight lines from corner to corner on the inside bottom of the form making an “X” (see Drawing 2). Take your anchor (1″ or 1 ½”) and center it on that “X” so that the sides of the anchor are parallel to the sides of the wooden form. Be sure that the flared end of the anchor is at the bottom of the form box.
C. Fill with concrete. Mix an 80 lb bag of Redi-Mix concrete as directed on the package. You’ll need someone to help you by holding the base anchor in position. Fill the form to the top with the concrete mix and allow one day to cure.
2. Locate the base anchor positions on your field.
(Assuming home plate is in place and a centerline can be established on the field)
A. Find the center of 2nd Base. With the centerline in place, refer to our Field Dimensions Diagrams to find the correct infield hypotenuse dimension (letter “C” on the diagram) for size field on which you will be installing the base anchors. Measure with a steel measuring tape from the point of home plate following along the centerline to the distance indicated for the Infield Hypotenuse [C]. Place a tarp pin or nail at that exact spot on the centerline. This is the center of 2nd base.
B. Measure to 1st Base. Measure from the 2nd base pin the required base distance [A] where 1st base will be positioned (again, reference our Field Dimensions Diagrams). At the same time, use a second steel tape measure to measure from the point of home plate the required base distance to 1st base. Where the two tape measures come together to form a right angle, set another tarp pin or nail. This is the back foul corner of 1st base.
C. Measure to 3rd Base. Now repeat the process to position 3rd base. Measure from the 2nd base pin the proper base distance to 3rd base. Again, using a second tape, measure from the point of home plate to 3rd base and where the tape measures meet to form a right angle is where you place your tarp pin or nail. This is the back foul corner of 3rd base.
D. Make sure it’s accurate. Measure the hypotenuse from the 1st base pin to the 3rd base pin. This is the same as the home plate to 2nd base hypotenuse. If these are not equal, you need to re-measure all of your base locations. Once the 1st-to- 3rd and home-to-2nd distances match, your base locations are accurately marked.
3. Install 1st & 3rd base anchors.
A. String it up, dig a hole. Run a string line up the foul edge of your foul line from the point of home plate to well past 1st or 3rd base pin. This string line should just touch the foul side of your 1st or 3rd base pin. To be installed correctly, the base should cover up the foul line as it runs under the base. Next, excavate an area about 2′ square in the area where the base should be located (see Drawing 3). Excavate knowing the pins you set indicate the back foul corner of the base. Since most metal anchors are about 8″ long, your 2 x 2 hole for the anchor should be 8 ½” to 8 ¾” deep. The top of the anchor post should always be ½” to ¾” below the surface so it is never caught when nail dragging. Make sure that the bottom of the hole is level and well compacted.
B. Place the anchor. Remove one of the concrete anchors from its form by turning it upside down and pounding the form with a rubber mallet to loosen. Make sure that there is no concrete inside the steel anchor post. If necessary, clear out the excess concrete for drainage purposes. Place the concrete anchor in the hole. Check your depth by spanning a 2×4 across the hole like a bridge and over the anchor post. There should be a gap of ½” to ¾” from the top of the anchor post to the bottom of your 2×4 bridge. If not, remove the anchor and correct the sub-grade accordingly.
C. Is it level? Once your depth is set, make sure the anchor is level. Use a torpedo level on the sides of the anchor post. If necessary, adjust the grade under the concrete anchor until it is level.
D. Position the anchor accurately. Using the string line as your guide, maneuver the anchor so one edge of the concrete is on the string line, the back foul corner of the concrete is where your pin was placed, and the rest of the concrete is on the “fair side” of your string (see Drawing 4). Again, measure from the point of home plate to the back foul corner of the concrete anchor to ensure correct base placement. You may place a base in the anchor to make for easier measuring. After adjusting your concrete anchor accordingly for correct placement, recheck for levelness and proper depth. Adjust if needed.
E. Bury the anchor. When all three parameters are met (distance, depth, level), the anchor can be buried. Add soil a couple inches at a time compacting thoroughly before adding the next couple inches. Continue until the level of soil in the excavated area matches the grade of the surrounding infield skin. Compact the soil, then moisten and apply topdressing if used.
4. Install 2nd base anchor.
A. Dig a hole, level it out. The 2nd base pin you placed marks the base’s exact center. Therefore, just excavate 1′ out in all directions from the base pin to get your 2′ square area. Then follow the same process of excavation and leveling as you did in Step 3 with the 1st and 3rd base anchors.
B. Find the exact center of 2nd base. Place the concrete anchor in the hole. Stretch your steel measuring tapes from the back foul corners of both 1st and 3rd base toward 2nd base. Where the two tapes meet forming a right angle at the proper base distance (letter “A” in our Field Dimensions Diagrams) is the exact center of 2nd base. Center the anchor post at that point (see Drawing 5), making sure the sides of the concrete anchor are parallel to the foul lines.
C. Bury the anchor. When all three parameters are met (distance, depth and level), the anchor can be buried, just as you buried the 1st and 3rd base anchors.
5. Test each base, troubleshoot if necessary.
With the anchors now in place, test them by installing the bases to see how they sit on the infield skin surface. The base will sit tight to the skin surface with no gaps under the base. If you see gaps from the base sitting up too high, troubleshoot these common installation problems:
- The steel anchor post is not level (plumb), which means the base will not sit level on the surface.
- The infield skin is not finish graded nice and level, and it does not match the surrounding grade causing low areas around the base.
- How old are your bases? With older bases, it is possible the bottom edges may be curled up — especially on the corners.
All of these problems present a risk to the players. If a base isn’t sitting properly and tight to the infield skin, there is a chance players could be injured when sliding into or running over the bases. You should correct these conditions immediately to reduce or eliminate the risk.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
It’s Never To Late To Save Your Program Money !
Check Out Our Insurance Program Today !
* ( 16 Different Amateur Sports ) *
( Officials, Tournaments, & Facilities ) *
1-800-622-7370
. . . . . . . . . . . . . . . . . . . . . . . .
www.sadlersports.com/soda
. . . . . . . . . . . . . . . . . . . . . . . .
“Proudly Serving The USA/Canada
0 Comments