▶ Aggressive Renovation: Any soil work that would need deep soil penetration and/or mixing down 2 to 4 inches in the soil profile.
▶ Moderate Renovation: Any soil work that would need shallow soil penetration and/or mixing down 1 to 2 inches in the soil profile.
▶ Day-To-Day Finish Grooming: Strictly grooming of the top 1/2 to 1 inch of infield skin.
DRAG | AGGRESSIVE RENOVATION | MODERATE RENOVATION | FINISH GROOMING |
---|---|---|---|
Beacon Premium 5×3 Nail Drag | ✱ | ✔ | ✔ |
Fieldmaster | ☓ | ✔ | ✔ |
Beacon Drag Spiker | ☓ | ✱ | ✔ |
Dirt Medic | ☓ | ✱ | ✔ |
Steel Mat Drags w/ Leveling Bar | ☓ | ✱ | ✔ |
X-Drag | ☓ | ☓ | ✔ |
Steel Mat Drags (without bar) | ☓ | ☓ | ✔ |
Beacon Cocoa Mat Quick Drags | ☓ | ☓ | ✔ |
Drag Broom | ☓ | ☓ | ✔ |
✔ Optimal equipment for the job
✱ May perform satisfactorily under certain field conditions
Thanks for pointing out that beacon drag spiker would be done in one motion which can be the best option for daily needs. I guess this is the kind of leveling drag that my brother needs for the piece of land he bought this year. It would help him achieve the garden and vegetable area that he wanted to have on one part of it.